Phase 1 — prove the interfaces
Build the pressure hull, track pods, bladder cells, sample bay, and buoy as separate test articles. Exercise seals, connectors, current limits, and retrieval points on the bench.
- Pressure and leak test
- Seeded gravel separation test
- PI calibration on known conductors
- Camera and sonar synchronization